Evidence register · 15 October 2026

Where each fact comes from.

We link policy-sensitive information to official sources and show when the evidence is incomplete. A source link by itself is not enough to call a local calculation verified.

Launch scope

Hyderabad, Telangana · TGSPDCL first

Savings model incomplete

Available as references

  • National CFA schedule reference
  • Telangana rooftop metering regulation and application steps reviewed
  • FY 2026–27 Telangana LT-I domestic tariff schedule verified as a reference

Still needs review

  • Reviewed TGSPDCL bill calculation and current domestic tariff model
  • Currentness and arrangement-specific application of the ₹2.57/kWh export-settlement proceeding; do not activate until reviewed
  • Hyderabad PV yield model with documented assumptions
  • Representative local installed-cost range or user-entered quote
  • Eligibility and bill treatment for state schemes
Source and authorityScope / dateStatus and use
PM-Surya Ghar: Muft Bijli Yojana — CFA to Residential Consumers
Ministry of New and Renewable Energy (MNRE)
National
Amended July 2025; scheme period through 31 March 2027
Checked 15 October 2026
Verified source

Supports the national CFA schedule and application conditions. It does not establish any individual household's eligibility or approval.

Order on Revised ARR and Retail Supply Tariffs for FY 2026–27
TGERC (order copy hosted by TGNPDCL)
TGSPDCL service area
Order dated 30 March 2026; effective 1 April 2026 to 31 March 2027
Checked 15 October 2026
Verified source

Residential LT-I categories, energy rates, per-kW fixed charges, and monthly customer charges are transcribed as a reference from Table 3-52 and Chapter 4. FSA/FCA and electricity duty are extra. A full bill and solar savings are not calculated.

TGERC Rooftop Solar PV Grid Interactive Systems Regulation No. 1 of 2025
Telangana Electricity Regulatory Commission (TGERC)
Telangana
Gazette notification, 15 November 2025
Checked 15 October 2026
Verified source

Supports the 2025 metering framework and application conditions. TGERC's 29 December 2025 export-settlement proceeding is recorded separately; household billing treatment remains unmodeled.

Proceeding approving rooftop solar export settlement rate under Regulation No. 1 of 2025
Telangana Electricity Regulatory Commission (TGERC)
TGDISCOMs, including TGSPDCL; net, group net, gross and virtual net metering arrangements covered by the proceeding
29 December 2025; ₹2.57/kWh; stated effective from notification of Regulation No. 1 of 2025 until further proceedings
Checked 15 October 2026
Needs review

The proceeding and stated rate were verified. No superseding proceeding was found in targeted official-site searches on 15 October 2026, but currentness must be reconfirmed and arrangement-specific billing applicability reviewed before activation. Not used in calculator outputs.

Order regarding Gruha Jyothi Scheme, O.P. No. 6 of 2024
TGERC / Government of Telangana
Telangana; eligible domestic connections
16 March 2024
Checked 15 October 2026
Needs review

The benefit is eligibility-dependent and affects bill economics. Enrollment is not inferred and is not yet modeled.

Telangana Clean and Green Energy Policy, 2025
Telangana Energy Department / TGREDCO
Telangana
G.O.Ms.No.2, 11 January 2025
Checked 15 October 2026
Needs review

The policy states 100% net SGST reimbursement for listed rooftop projects including households. The claim process and eligibility are unresolved; no amount is calculated.

Solar Resource Assessment Division
National Institute of Solar Energy (NISE), MNRE
India
Resource page; accessed 15 October 2026
Checked 15 October 2026
Needs review

Radiation measurements are not a per-kW rooftop generation forecast. No household PV yield assumption is used.