Telangana · reviewed 15 October 2026

Local rooftop rules, in plain language.

Telangana's current rooftop solar regulation explains how metering, applications, capacity checks, and exported electricity are handled. Your electricity bill still determines which distribution utility to contact.

The Telangana Electricity Regulatory Commission (TGERC) notified Regulation No. 1 of 2025 in the Telangana Gazette on 15 November 2025. It covers net metering, group net metering, gross metering, and virtual net metering arrangements for rooftop solar systems connected to Telangana distribution licensees.

Check your bill first. This page describes Telangana's state regulation. It does not map every street to a utility, determine interconnection feasibility, or confirm a household's eligibility.

What the regulation says for residential connections

  • Net metering and gross metering rooftop systems have a 1 kWp minimum system size under the regulation.
  • For residential and government consumers, net-metered or gross-metered capacity may not exceed 100% of the consumer's sanctioned load.
  • The cumulative rooftop solar capacity for LT consumers connected to a distribution transformer is limited to 50% of that transformer's rated capacity. Local network headroom can therefore affect feasibility.
  • Consumers with pending arrears are not entitled to the metering arrangements listed in the regulation.

These are regulatory limits and process conditions, not a design recommendation. A household's system still needs a site assessment and the required distribution-licensee approval.

Application and feasibility process

The regulation directs consumers to submit the relevant application to their distribution licensee. It lists a ₹2,500 processing fee per LT connection and identifies the local Divisional Engineer (Operations) as the nodal contact for the solar metering programme.

After receiving an application, the distribution licensee must acknowledge receipt and notify the consumer of missing documents within 7 working days. It must communicate interconnection feasibility within 15 working days after receiving a proper application. Feasibility depends on the relevant distribution transformer or feeder capacity.

Check the current forms, payment details, and contact office on the official distribution-licensee website before applying.

Residential tariff schedule for FY 2026–27

The TGERC order divides LT-I domestic consumers into categories based on total monthly use. The rates below are the published energy and fixed-charge schedule, effective 1 April 2026 through 31 March 2027.

Category and monthly useEnergy bandEnergy chargeFixed charge
LT-I(A)
Monthly consumption not exceeding 100 units
0–50 units₹1.95 / kWh₹10.00 / kW / month
LT-I(A)
Monthly consumption not exceeding 100 units
51–100 units₹3.10 / kWh₹10.00 / kW / month
LT-I(B)(i)
Monthly consumption above 100 and not exceeding 200 units
0–100 units₹3.40 / kWh₹10.00 / kW / month
LT-I(B)(i)
Monthly consumption above 100 and not exceeding 200 units
101–200 units₹4.80 / kWh₹10.00 / kW / month
LT-I(B)(ii)
Monthly consumption above 200 units
0–200 units₹5.10 / kWh₹10.00 / kW / month
LT-I(B)(ii)
Monthly consumption above 200 units
201–300 units₹7.70 / kWh₹10.00 / kW / month
LT-I(B)(ii)
Monthly consumption above 200 units
301–400 units₹9.00 / kWh₹10.00 / kW / month
LT-I(B)(ii)
Monthly consumption above 200 units
401–800 units₹9.50 / kWh₹10.00 / kW / month
LT-I(B)(ii)
Monthly consumption above 200 units
Above 800 units₹10.00 / kWh₹50.00 / kW / month

These are not a flat energy rate or a complete bill estimate. The order says FSA/FCA is extra and electricity duty is excluded from the tariff. It also classifies domestic consumers by total monthly units, so a complete bill calculation needs to model the category and all relevant charges.

The same order separately lists monthly LT-I domestic customer charges by consumption band: ₹40 (0–50 units), ₹70 (51–100), ₹90 (101–200), ₹100 (201–300), ₹120 (301–400), ₹140 (401–800), and ₹160 (above 800). These are additional to the per-kW fixed charge and energy charges. FSA/FCA and electricity duty remain outside this schedule.

Eligible households may also receive a zero bill for monthly use up to 200 units under Gruha Jyothi. Enrollment is household-specific; SolarWise does not infer it. See the TGERC Gruha Jyothi order.

Tariff source: Retail Supply Tariff Order for FY 2026–27, dated 30 March 2026, Table 3-52 and §4.2. Effective 2026-04-01 to 2027-03-31; checked 15 October 2026.

How exported units are treated

Under net metering, exported units offset imported units in the billing period. When exports exceed imports, the excess is settled at a rate based on the lowest tariff among solar PPAs, PSAs, or PUAs entered by Telangana distribution licensees under section 63 in the preceding financial year. If no such rate exists, the regulation uses the latest previous financial year. TGERC is to notify the settlement rate each year.

The regulation also says a consumer with net exports receives a monthly minimum bill. When imports exceed exports, the bill is raised after exported units are credited; other charges, taxes, duties, or cesses allowed by the Commission or Government may still apply to net billed units.

TGERC's 29 December 2025 proceeding specifies ₹2.57/kWh for covered export-settlement arrangements. The proceeding says this applies until further proceedings. SolarWise has not confirmed whether a later order or arrangement-specific billing direction changes its applicability, and does not include export value in a personalized estimate.

What this means for an estimate

The regulation helps define how a system can connect and how energy is accounted for, but it does not establish what a particular roof will generate, what an installer will charge, or what every household bill will become. System yield, household use, tariff category, eligibility-based benefits, and the current export rate all matter.

For the national residential support schedule, see the PM-Surya Ghar CFA guide. For source status and the tariff-data gap, see Sources and methodology.

Primary source: TGERC Rooftop Solar PV Grid Interactive Systems Regulation No. 1 of 2025, Gazette notification dated 15 November 2025, especially clauses 4, 6, and 8.1.Export rate source: TGERC proceeding approving the settlement rate, dated 29 December 2025. The order states ₹2.57/kWh applies until further proceedings; currentness and arrangement-specific application require confirmation.